Average cost in Vancouver
$5,800 — $26,500
$12 — $42 per sq ft
Cost Breakdown
ItemizedAsphalt, concrete mix, and sub-base gravel
42%
Excavation, grading, and finishing
36%
Heavy machinery rental and operation
12%
City of Vancouver fees and debris hauling
10%
GST+PST at 12%
📋What's Included
ScopeTypically Includes
- Old surface removal
- Gravel base preparation
- Asphalt or concrete paving
- Grading & compaction
- Labor
Typically Excludes
- Heated driveway systems
- Decorative stamping or staining
- Retaining walls
- Drainage systems
- Sealing (first year)
Based on a standard 2-car driveway (400-600 sq ft) with asphalt.
🧮Estimate Your Cost
InteractiveEstimated Cost
$4,816 — $7,224
Based on 7 sources and market data for Vancouver. Actual costs may vary depending on specific project requirements.
📈Price Momentum
Year-over-year~1 year ago
$10,158
Today
$10,645
Driveway Paving in Vancouver is ↑ 4.8% compared to roughly a year ago — about $488 more on the average project.
Comparison derived from the year-over-year change rate, not a month-by-month price index. We don't store historical snapshots yet — when we do, this will become a real time series.
🏢Top Driveway Contractors in Vancouver
Verified providersDhillon Bros Paving Ltd
10780 Blundell Rd, Richmond, BC V6Y 1L1, Canada
77 reviews
Provider data sourced from public business directories. Ratings and reviews are public and may change. LookupCost is not affiliated with listed providers.
💬What People Actually Paid
Community❓Common Questions
In 2026, asphalt typically costs between $12 and $18 per sq ft, while concrete ranges from $22 to $38 per sq ft depending on the finish and reinforcement.
A standard driveway crossing permit in Vancouver currently costs between $285 and $650, depending on the complexity of the sidewalk and curb modifications required.
Yes, due to high annual rainfall, Vancouver contractors recommend a thicker sub-base of 8-12 inches of crushed rock for drainage, which adds approximately $3.50 per sq ft to the total project cost compared to other BC regions.
Most residential projects take 3 to 5 days. This includes 1-2 days for excavation and base prep, and 1-2 days for pouring and finishing, with asphalt being ready for use faster than concrete.
📊Our Methodology
How we collect dataAggregated from 7+ verified web sources and cost databases
Licensed contractor estimates and regional cost guides
Government construction and labor statistics
Community-reported project costs and reviews
Last data collection: 2 weeks ago. Updates run weekly. All costs in CAD.
About this data
Cost figures are estimates synthesized from public market data using AI research and refreshed regularly. Real project costs vary by scope, materials, contractor, and site conditions. Always get verified quotes from licensed contractors for your specific project.
Spotted bad data? Let us know — we'll review and update.