Quick Answer

Basement Finishing Cost in Toronto (2026)

Average cost in Toronto

$76,161avg

$35,000 — $145,000

$45 — $135 per sq ft

+4.9% YoY
8 sources
Updated 3 weeks ago
GTA Region

Cost Breakdown

Itemized
Labor

Skilled trades and general contracting

$15,750 — $65,250

45%

Materials

Lumber, drywall, flooring, and insulation

$12,250 — $50,750

35%

Plumbing & Electrical

Rough-ins, fixtures, and panel upgrades

$4,200 — $17,400

12%

Permits & Design

City fees and architectural drawings

$1,750 — $7,250

5%

Contingency

Unexpected repairs and moisture issues

$1,050 — $4,350

3%

🧾HST (13%) — Ontario
Base cost + $9,901 tax$86,062

HST at 13%

📋What's Included

Scope

Typically Includes

  • Framing & drywall
  • Basic flooring (LVP or carpet)
  • Electrical (outlets & lighting)
  • Egress window (if required)
  • Painting
  • Basic bathroom rough-in

Typically Excludes

  • Full basement bathroom
  • Built-in bar or kitchen
  • Home theater wiring
  • Waterproofing (separate cost)
  • Permits & inspections

Assumes an unfinished basement with existing concrete floor and basic utilities.

🧮Estimate Your Cost

Interactive

Estimated Cost

$37,650

$30,120 — $45,180

Based on 8 sources and market data for Toronto. Actual costs may vary depending on specific project requirements.

📈Price Momentum

Year-over-year

~1 year ago

$72,603

Today

$76,161

Basement Finishing in Toronto is 4.9% compared to roughly a year ago — about $3,558 more on the average project.

Comparison derived from the year-over-year change rate, not a month-by-month price index. We don't store historical snapshots yet — when we do, this will become a real time series.

🏢Top Basement Finish Contractors in Toronto

Verified providers
🔨

Astaneh Construction

3080 Yonge St Ste 6060, Toronto, ON M4N 1S1, Canada

5.0
★★★★★

119 reviews

🔨

CD Flood & Sewer Water Damage Cleanup

77 Bloor St W #636, Toronto, ON M5S 1M2, Canada

5.0
★★★★★

386 reviews

🔨

Acon Renovations

103 The Queensway, Toronto, ON M6S 5B3, Canada

4.9
★★★★½

75 reviews

🔨

CSG Renovation

30 Powerhouse St 101 Office G12, Toronto, ON M6H 0C6, Canada

4.9
★★★★½

72 reviews

🔨

Assured Basements (Basement Renovation Contractors)

1111 Finch Ave W Unit 5, North York, ON M3J 2E5, Canada

4.5
★★★★½

161 reviews

Provider data sourced from public business directories. Ratings and reviews are public and may change. LookupCost is not affiliated with listed providers.

💬What People Actually Paid

Community

Common Questions

A fully legal secondary suite typically costs between $90,000 and $140,000. This includes fire separation, separate entrances, egress windows, and full kitchen/bathroom installations required by the 2025-2026 updated building codes.

Building permit fees for the City of Toronto generally range from $1,000 to $1,500. However, professional architectural drawings required for the application typically cost an additional $2,000 to $5,000 depending on complexity.

Adding a standard three-piece bathroom (toilet, sink, shower) costs between $15,000 and $22,000. If the concrete slab requires breaking for new drain lines (no existing rough-in), expect to add $3,000 to $8,000 to that total.

Homeowners can expect a 5-10% increase in property value. For those creating rental units, legal suites in Toronto are currently fetching between $1,500 and $2,500 per month in rent as of mid-2026.

📊Our Methodology

How we collect data
1

Aggregated from 5+ verified web sources and cost databases

2

Licensed contractor estimates and regional cost guides

3

Government construction and labor statistics

4

Community-reported project costs and reviews

Last data collection: 3 weeks ago. Updates run weekly. All costs in CAD.

About this data

Cost figures are estimates synthesized from public market data using AI research and refreshed regularly. Real project costs vary by scope, materials, contractor, and site conditions. Always get verified quotes from licensed contractors for your specific project.

Spotted bad data? Let us know — we'll review and update.